The Patrind Hydropower Project is a 150 MW run-of-river hydropower plant, comprising:
- 43.5 metre high, 168 metre long concrete gravity dam
- 2.2 km long, 7.0 metre diameter power tunnel
- Generation flow 151.66 m3/sec
- 3 x 50 MW Francis type units
- 132 kV GIS switchgear
Scope of work
Multiconsult is acting as the Independent Engineer for monitoring of construction progress; witnessing of commissioning and the certification of the complex for commercial operation.
Our services
- Quarterly construction progress reviews
- Specialist advice on the design of the scheme
- Witnessing and certification of commissioning the generating plant