Patrind Hydropower Project

Independent Engineer

The Patrind Hydropower Project is a 150 MW run-of-river hydropower plant, comprising:

  • 43.5 metre high, 168 metre long concrete gravity dam
  • 2.2 km long, 7.0 metre diameter power tunnel
  • Generation flow 151.66 m3/sec 
  • 3 x 50 MW Francis type units
  • 132 kV GIS switchgear

Scope of work

Multiconsult is acting as the Independent Engineer for monitoring of construction progress; witnessing of commissioning and the certification of the complex for commercial operation.

Our services

  • Quarterly construction progress reviews
  • Specialist advice on the design of the scheme
  • Witnessing and certification of commissioning the generating plant