The Gulpur Hydropower Project is a 102 MW run-of-river hydropower plant, comprising:

  • 66.6 metre high, 205 metre long concrete gravity dam
  • 2 x 150 metre long, 5.0 metre diameter power tunnels
  • Generation flow 201 m3/sec
  • 2 x 51 MW Francis type units
  • 132 kV Switchgear

Scope of work

Multiconsult is acting as the Independent Engineer for Re-Opener Verifier role in partnership with Associated Consulting Enigneers of Pakistan; monitoring of construction progress; witnessing of commissioning and the certification of the complex for commercial operation.

Our services

  • Rock classification and payment certification for the tunneling works
  • Quarterly construction progress reviews
  • Specialist advice on the design of the scheme
  • Witnessing and certification of commissioning the generating plant