Multiconsult Kikagati Uganda Tender Documents

1/4

Retrieving soil samples | Photo: E. Thorn, Multiconsult

Multiconsult Kikagati Uganda Tender Documents

2/4

Surveying the site | Photo: A.H. Lundberg, Multiconsult

Multiconsult Kikagati Uganda Tender Documents

3/4

Remains of an old hydropower structure on the site | Photo: E. Thorn, Multiconsult

Multiconsult Kikagati Uganda Tender Documents

4/4

The Kikagati Hydroeletric Power Plant site | Photo: M. Headling

Kikagati Hydroeletric Power Project

Norplan AS on behalf of Multiconsult in a joint venture with Scott Wilson Limited, and with sub-contractors Newplan Limited of Uganda and Norplan Tanzania Limited of Tanzania, for the preparation of tender documents for engineering, procurement and construction for the Kikagati Hydroeletric Plant.

The Kikagati Hydroeletric Power Project is a low-head, run-of-river 16 MW Hydroelectric Project on River Kagera. The Kagera River is the main tributary to Lake Victoria and the river basin area lies within Rwanda, Burundi, Tanzania and Uganda. The site is on the border between Uganda and Tanzania and includes dams and a short headrace and tailrace founded on largely varying ground conditions.

 Scope of work

  • Geological interpretation report
  • Hydrology assessment report
  • Dam specification and drawings
  • Indicative cost report
  • Earthquake assessment
  • Area maps

Our services

  • Geotechnical investigations
  • Hydrology assessment
  • Dam design
  • Land surveying