Stena Drillmax IV is a drillship equipped with twin hoisting and a derrick. Multiconsult was responsible for upgrading the design from earlier assignment Drillmax I for increased weight and increased loads from derrick, and calculations, 3D-modelling and design drawings for a wind wall of 8 m.
Scope of work
- Complete design
- ULS analyses
- PLS analyses
- FLS analyses
- FEM analyses
Our services
- Consultation
- Design
- Wind wall
- Upgrading earlier design
- Calculations
- 3D-modelling
- Design drawings